$$$$
{{ $t($store.state.user.experience_value_in_dollars) }}
Expert
{{ $t($store.state.user.experience_search_name) }}
0
jobs
Steve Ogden
,
HINDLEY GREEN, United Kingdom
Experience
Other titles
Skills
I'm offering
Markets
United Kingdom
Language
English
Fluently
My experience
2013 - ?
job
Senior Manufacturing Engineer. (Permanent)
MBDA.
Flaads, Brimstone. Stormshadow.
* Authored Process Plannings (Layouts) for the assembly of Cableforms & Harnesses on Missiles for various projects including Flaads, Stormshadow, Brimstone using SAP.
* Raised Problem Reports against design drawing anomalies.
* Applied corrective actions to Route Cards as a result of Non Conformances using SAP.
* Sourced and procured tooling for Flaads cables.
* Designed a Tooling Database for Engineering use.
Tool Sets Applicable: Microsoft Publisher
Microsoft Word
Microsoft Excel
Microsoft PowerPoint
Microsoft Visio
SAP.
Matrix (PLM)
* Authored Process Plannings (Layouts) for the assembly of Cableforms & Harnesses on Missiles for various projects including Flaads, Stormshadow, Brimstone using SAP.
* Raised Problem Reports against design drawing anomalies.
* Applied corrective actions to Route Cards as a result of Non Conformances using SAP.
* Sourced and procured tooling for Flaads cables.
* Designed a Tooling Database for Engineering use.
Tool Sets Applicable: Microsoft Publisher
Microsoft Word
Microsoft Excel
Microsoft PowerPoint
Microsoft Visio
SAP.
Matrix (PLM)
Design, Excel, Powerpoint, SAP, Database, Word, Visio, Engineering
2007 - 2013
job
Senior Manufacturing Engineer. (Permanent)
BAE Systems.
F-35 Lightning II.
* Primary Electrical ME for all issues arising from the internal supply of Flight Test / Ground Test harness products, the build line of the Aft fuselage and Empennage products on the F-35 program.
* Authored Process Planning (layouts) for Electrical & Mechanical Assembly on F-35 Program.
* Raised, coordinated and answered Manufacturing Engineering Query Notes against all aspects of the engineering and design of the aforementioned products, primarily in direct response to DMS snags raised by Production Operators and Inspection / QC. Determined point of embodiment through coordination with the F-35 Engineering IPT, covering any shortfalls with appropriate engineering direction.
* Aided the Rapid Design Change Team (AEA) by interrogating CATIA and associated functions e.g. E3D, to coordinate and assist in Design Issue resolution through the Electrical Design IPTs (Production, FTI and GTI).
* Provided 'bottom-up' change engineering, from various sources (Concession, Production Permit, AEA).
* Created and released a number of QMS documents, covering areas such as Electrical Engineering ME Governance for FTI / GTI harness products and ME & shop aid information clarifying the intent of released engineering (Glossary Of Terms).
* Conversant in the use of the design, configuration and production systems employed by the F-35 program, namely CATIA, VAS, Metaphase, JDL, DMS, HMS CAPP (Planning, MEQN, NCM, and BOM modules)
Tool Sets Applicable: Microsoft Word
Microsoft PowerPoint
Microsoft Access
Microsoft Excel
Catia
E3D
Metaphase
DMS
HMS CAPP
* Primary Electrical ME for all issues arising from the internal supply of Flight Test / Ground Test harness products, the build line of the Aft fuselage and Empennage products on the F-35 program.
* Authored Process Planning (layouts) for Electrical & Mechanical Assembly on F-35 Program.
* Raised, coordinated and answered Manufacturing Engineering Query Notes against all aspects of the engineering and design of the aforementioned products, primarily in direct response to DMS snags raised by Production Operators and Inspection / QC. Determined point of embodiment through coordination with the F-35 Engineering IPT, covering any shortfalls with appropriate engineering direction.
* Aided the Rapid Design Change Team (AEA) by interrogating CATIA and associated functions e.g. E3D, to coordinate and assist in Design Issue resolution through the Electrical Design IPTs (Production, FTI and GTI).
* Provided 'bottom-up' change engineering, from various sources (Concession, Production Permit, AEA).
* Created and released a number of QMS documents, covering areas such as Electrical Engineering ME Governance for FTI / GTI harness products and ME & shop aid information clarifying the intent of released engineering (Glossary Of Terms).
* Conversant in the use of the design, configuration and production systems employed by the F-35 program, namely CATIA, VAS, Metaphase, JDL, DMS, HMS CAPP (Planning, MEQN, NCM, and BOM modules)
Tool Sets Applicable: Microsoft Word
Microsoft PowerPoint
Microsoft Access
Microsoft Excel
Catia
E3D
Metaphase
DMS
HMS CAPP
Design, Excel, Powerpoint, Word, Test, Engineering, Electrical design, Electrical engineering, Direction, Production, QC, UP, ME
1995 - 1998
job
Manufacturing Engineer. (Permanent)
Dedicated Micros.
* Created Process Plannings for Printed Circuit Boards (SMT & Through Hole) & Electrical Unit assembly using Windows based software - Microsoft Word & AutoCAD Lt 97.
* Produced AutoCAD drawings, using AutoCAD Lt 97, for panelisation of Printed Circuit Boards, to maximise efficiency of Production and minimise cost of laminate.
* Updated and maintained Bill of Materials on an MRP11 system.
* Liased with Printed Circuit Boards Development Engineers on optimum PCB layout to eliminate the risk of problems in production.
* Procured tooling for SMT screen printing (i.e. Solder Paste screens and Glue screens) using gerber data from Printed Circuit Boards design systems, and then processing the gerber data using Gerb Tool. Procured Cropping Plates for Through Hole Components.
* Authored departmental company procedures for Procurement of PCB tooling, Panelisation of PCB's and others.
Tool Sets Applicable: AutoCad
Gerb Tool
Microsoft Word
DMS
BCAPE
HMS CAPP
PEGS
DPDS
* Produced AutoCAD drawings, using AutoCAD Lt 97, for panelisation of Printed Circuit Boards, to maximise efficiency of Production and minimise cost of laminate.
* Updated and maintained Bill of Materials on an MRP11 system.
* Liased with Printed Circuit Boards Development Engineers on optimum PCB layout to eliminate the risk of problems in production.
* Procured tooling for SMT screen printing (i.e. Solder Paste screens and Glue screens) using gerber data from Printed Circuit Boards design systems, and then processing the gerber data using Gerb Tool. Procured Cropping Plates for Through Hole Components.
* Authored departmental company procedures for Procurement of PCB tooling, Panelisation of PCB's and others.
Tool Sets Applicable: AutoCad
Gerb Tool
Microsoft Word
DMS
BCAPE
HMS CAPP
PEGS
DPDS
Design, Layout, Autocad, Procurement, Word, Windows, Development, Software, Production, PCB, Processing, Autocad
1985 - 1995
job
Manufacturing Engineer. (Permanent)
British Aerospace Dynamics Lostock.
* Planned shop floor manufacture with respect to correct methods of assembly of Printed Circuit Boards, Electronic Units (L.R.U.'S) and Cableforms (Looms) on major defence projects including Sea Eagle & Rapier 2000 (Jernas).
* Authored Process Plannings (Layouts) for the assembly of Cableforms & Harnesses on Aircraft Missile Launchers & Guided Weapons, Printed Circuit Boards & Electrical Units/Panels on Helicopter Installed Equipment and Guided Weapons using P.E.M.S. (an integrated word processor & C.A.D. type system).
* Fully conversant with Kanban, MRP II & ISO9000 philosophies & disciplines. Represented Production Engineering on Integrated Production Teams (K.P.S.) & Continuous Improvement Teams.
* Conversant with problem solving techniques for process improvement & cost reduction: Pareto Analysis, Control Charts, Process Capability Studies and other Statistical Process Control Tools.
* Resourced correct tooling and production aids for Cableform assembly and Printed Circuit Board Assembly.
* Liased with & advised Design office and Test department to ensure smooth, cost effective methods & practises of engineering.
Tool Sets Applicable: PEMS
DRS
* Authored Process Plannings (Layouts) for the assembly of Cableforms & Harnesses on Aircraft Missile Launchers & Guided Weapons, Printed Circuit Boards & Electrical Units/Panels on Helicopter Installed Equipment and Guided Weapons using P.E.M.S. (an integrated word processor & C.A.D. type system).
* Fully conversant with Kanban, MRP II & ISO9000 philosophies & disciplines. Represented Production Engineering on Integrated Production Teams (K.P.S.) & Continuous Improvement Teams.
* Conversant with problem solving techniques for process improvement & cost reduction: Pareto Analysis, Control Charts, Process Capability Studies and other Statistical Process Control Tools.
* Resourced correct tooling and production aids for Cableform assembly and Printed Circuit Board Assembly.
* Liased with & advised Design office and Test department to ensure smooth, cost effective methods & practises of engineering.
Tool Sets Applicable: PEMS
DRS
Design, R, Continuous improvement, C, Word, Kanban, Test, Engineering, Office, Production
My education
1998
-
2000
Preston College
N/a, N/a
N/a, N/a
1977
-
1981
Leigh college
Hndhncorequivalent, Electrical/Electronic Engineering
Hndhncorequivalent, Electrical/Electronic Engineering
1972
-
1977
Leigh C E High School
HighSchoolOrEquivalent, 7 CSE's
HighSchoolOrEquivalent, 7 CSE's
?
-
1995
Bolton Institute of Higher Education
N/a, N/a
N/a, N/a
Steve's reviews
Steve has not received any reviews on Worksome.
Contact Steve Ogden
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Steve directly in Worksome.
38100+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark