$$$$
Expert
GBP
?
/ hourEdit your rates
GBP
?
/ monthEdit your rates
0 jobs
Senior Authorised Person/Commissioning
Graeme Brown, South Shields
Experience
15 - 24 years
Other titles
132KV Senior Authorised Person11KV Senior Authorised PersonLead Commissioning EngineerCommissioning Engineer/Lead Engineer/11KV Authorised Person
Skills
DocumentationEnvironmental impactRisk assessmentsSwitchingSAP + 14 more
I'm offering
I am a qualified E&C electrical engineer with over 20 years of Electrical and Commissioning experience in various fields, within EPC Environment, Power Production, HV/LV Power Generation, Control Systems, Rotating Equipment, High Integrity Plant, Specialist Electrical Systems and EX Equipment and Environment.
I am fully conversant with HV/ LV Electrical and Protection, Applications, Installations and Commissioned
on/offsite major equipment, erection and operations in hostile environments. I am self-sufficient
and resilient.
I have held 132KV Energisation/S.A.P Roles on Two Private Energy from Waste Projects
I am a self-motivator who enjoys an engineering challenge. With my past experience within the above fields, I can bring a wealth of knowledge along with engineering integrity and skills.
I am fully conversant with HV/ LV Electrical and Protection, Applications, Installations and Commissioned
on/offsite major equipment, erection and operations in hostile environments. I am self-sufficient
and resilient.
I have held 132KV Energisation/S.A.P Roles on Two Private Energy from Waste Projects
I am a self-motivator who enjoys an engineering challenge. With my past experience within the above fields, I can bring a wealth of knowledge along with engineering integrity and skills.
Markets
United Kingdom
Language
Language skills
English
Fluently
Ready for
Smaller project
Larger project
Ongoing relation / part-time
Full time contractor
Available
Typically available within 14 days
SuMoTuWeThFrSa
27282930123456789101112131415161718192021222324252627282930311234567
My experience
2019 - ?
job
132KV Senior Authorised Person Hitachi Zoosen Inova (HZI).
FM2 Ferrybridge Energy From Waste Power Station Project 90MW
Using a thermal EfW process, FM2 will annually handle around 570,000 tonnes of waste-derived fuel from various sources such as municipal solid waste, commercial and industrial waste and waste wood. The plant will be producing enough energy to power around 170,000 homes. With net energy efficiency of 31%, it will be on a par with its sister plant and will also rank among the top facilities in Europe in this regard.
132KV Senior Authorised Person (SAP) April-2019 - Present
I'm authorised as 132KV SAP for the FM2 project, the duties include
• HV Switching Procedures 132KV, 11KV,
• HV Switching 132KV, 11KV
• HV Isolations 132KV, 11KV
• Issue & Cancellation of Safety Documentation: PTW,SFT,LOA, O.I.E.C from NPG, Access Permit
• LOTO of all Electrical Systems to achieve safety from the system
• LV Isolations
• Meeting with NPG DNO with 132KV import and export voltage
• Meeting with SPEC with regards to the 11KV temporary supply to site
• Leading safety meetings with all contractors on site
• Meetings with contractors and vendors with site working to achieve safety from the system
M & W Group
Eco Park Shepperton Energy from Waste Power Station Project 2.4 MW
These two plants, Gasification and Anaerobic Digestion will process household waste for energy and recycling.
This is done by separating the metals and aggregates for recycling and the rest shredded for fuel for the burners. The food waste will be broken down by micro organisms and the gas produced will be used to generate electricity in a gas engine and the solid compound left shall be used as fertiliser.
Using a thermal EfW process, FM2 will annually handle around 570,000 tonnes of waste-derived fuel from various sources such as municipal solid waste, commercial and industrial waste and waste wood. The plant will be producing enough energy to power around 170,000 homes. With net energy efficiency of 31%, it will be on a par with its sister plant and will also rank among the top facilities in Europe in this regard.
132KV Senior Authorised Person (SAP) April-2019 - Present
I'm authorised as 132KV SAP for the FM2 project, the duties include
• HV Switching Procedures 132KV, 11KV,
• HV Switching 132KV, 11KV
• HV Isolations 132KV, 11KV
• Issue & Cancellation of Safety Documentation: PTW,SFT,LOA, O.I.E.C from NPG, Access Permit
• LOTO of all Electrical Systems to achieve safety from the system
• LV Isolations
• Meeting with NPG DNO with 132KV import and export voltage
• Meeting with SPEC with regards to the 11KV temporary supply to site
• Leading safety meetings with all contractors on site
• Meetings with contractors and vendors with site working to achieve safety from the system
M & W Group
Eco Park Shepperton Energy from Waste Power Station Project 2.4 MW
These two plants, Gasification and Anaerobic Digestion will process household waste for energy and recycling.
This is done by separating the metals and aggregates for recycling and the rest shredded for fuel for the burners. The food waste will be broken down by micro organisms and the gas produced will be used to generate electricity in a gas engine and the solid compound left shall be used as fertiliser.
SAP, REST, C, Net, It, SOLID, Safety, Power, Energy, Energy
2018 - 2019
job
11KV Senior Authorised Person SAP.
SAP for the Eco Park project, the duties include
• HV Switching Procedures 11KV
• HV Switching 11KV
• HV Isolations 11KV
• Mechanical Isolations
• Issue & Cancellation of Safety Documentation: PTW,SFT,LOA, O.I.E.C from SSE, Access Permit,
• LOTO of all Electrical & Mechanical Systems to achieve safety from the system
• SRCC Authorisations
• LV Isolations
• Implementing new ideas to site to highlight equipment under SRCC and potentially operational
• Leading safety meetings with all contractors on site
• Meetings with contractors and vendors with site working to achieve safety from the system
My role on site is extremely challenging as the project is still in the construction phase but now moving in to the commissioning phase. This produces several problems with systems and sub- systems that require energisation but still achieving safety from the system to other contractors. This is achieved by following the safety rules, electrical or mechanical isolations for construction to continue, issuing correct safety documentation with all safety keys in LOTO system and safety meeting taken with all contractors.
• HV Switching Procedures 11KV
• HV Switching 11KV
• HV Isolations 11KV
• Mechanical Isolations
• Issue & Cancellation of Safety Documentation: PTW,SFT,LOA, O.I.E.C from SSE, Access Permit,
• LOTO of all Electrical & Mechanical Systems to achieve safety from the system
• SRCC Authorisations
• LV Isolations
• Implementing new ideas to site to highlight equipment under SRCC and potentially operational
• Leading safety meetings with all contractors on site
• Meetings with contractors and vendors with site working to achieve safety from the system
My role on site is extremely challenging as the project is still in the construction phase but now moving in to the commissioning phase. This produces several problems with systems and sub- systems that require energisation but still achieving safety from the system to other contractors. This is achieved by following the safety rules, electrical or mechanical isolations for construction to continue, issuing correct safety documentation with all safety keys in LOTO system and safety meeting taken with all contractors.
SAP, C, Safety
2017 - 2018
job
Lead Commissioning Engineer Babcock Wilcox & Volund.
The Margam green energy plant located in south wales is a 40 MW biomass power station which will be fired by waste wood.
Lead Commissioning Engineer/132KV SAP October 2017- May 2018
• Senior Authorised Person Authorised by the Consortium Director for up to 132KV, duties include switching ,isolations, procedures and LOTO of 132KV, 11KV,415V , 240V, 110V AC/DC 50 VDC Mechanical isolations on utility air, instrument air, pneumatic and hydraulic equipment.
• Produce S.R.C.C (Safety Rules Clearance Certificate) for safe energisation of electrical & mechanical systems.
• Review and amend the technical procedures, RAMS, turn over packages
• Manage the test and commissioning of power plant systems from 690v to 24v this includes 690v Transformers, UPS Transformers and system, Emergency Diesel Generator Saxlund conveyor system, Feed water pumps, ABB & Siemens 130KW motors, ABB compressors, ACC 690v Fans, , DCS I/O checking
• Daily commissioning meeting between construction, commissioning and client (Eco 2) and clients representative (Parsons Brienkenhoff WPS)
• Manage subcontractors for works including 132KV Transformer modifications, Conveyor commissioning, all site services
My role on the site changed with the project changing. I was the commissioning lead for BWV that acted as an intermediate between construction and commissioning for all documentation including mechanical completion documentation of electrical and mechanical packages, commissioning planning of systems that was driven by the planning program. I was asked to become the SAP for the plant, my duties include the LOTO,proving systems are isolated and safe to work on, isolation documentation, permit to work. I had to work with (WPD(Western Power Distribution) for the safe and controlled de enerigisation of the 132KV for essential works on the 132KV transformer, this included cross boundary isolations and documentation. We had to de isolate all systems from 24v to 11KV down stream of the 132KV transformer in a safe manner with switching schedules and RAMS produced and approved by the principle contractor and the clients representative WPS.
Lead Commissioning Engineer/132KV SAP October 2017- May 2018
• Senior Authorised Person Authorised by the Consortium Director for up to 132KV, duties include switching ,isolations, procedures and LOTO of 132KV, 11KV,415V , 240V, 110V AC/DC 50 VDC Mechanical isolations on utility air, instrument air, pneumatic and hydraulic equipment.
• Produce S.R.C.C (Safety Rules Clearance Certificate) for safe energisation of electrical & mechanical systems.
• Review and amend the technical procedures, RAMS, turn over packages
• Manage the test and commissioning of power plant systems from 690v to 24v this includes 690v Transformers, UPS Transformers and system, Emergency Diesel Generator Saxlund conveyor system, Feed water pumps, ABB & Siemens 130KW motors, ABB compressors, ACC 690v Fans, , DCS I/O checking
• Daily commissioning meeting between construction, commissioning and client (Eco 2) and clients representative (Parsons Brienkenhoff WPS)
• Manage subcontractors for works including 132KV Transformer modifications, Conveyor commissioning, all site services
My role on the site changed with the project changing. I was the commissioning lead for BWV that acted as an intermediate between construction and commissioning for all documentation including mechanical completion documentation of electrical and mechanical packages, commissioning planning of systems that was driven by the planning program. I was asked to become the SAP for the plant, my duties include the LOTO,proving systems are isolated and safe to work on, isolation documentation, permit to work. I had to work with (WPD(Western Power Distribution) for the safe and controlled de enerigisation of the 132KV for essential works on the 132KV transformer, this included cross boundary isolations and documentation. We had to de isolate all systems from 24v to 11KV down stream of the 132KV transformer in a safe manner with switching schedules and RAMS produced and approved by the principle contractor and the clients representative WPS.
SAP, C, R, Test, Safe, Safety, Power, Energy, Energy, UP
2017 - 2017
temp
Commissioning Manager Spencer Group.
Port of Tyne - Renewable Fuels Terminal
This renewable fuel terminal project involves the design and build of import facilities, wood pellet storage and rail loading facilities for biomass to meet the full requirements of Lynemouth Power Station.
Commissioning Manager (contract) March 2017 - October 2017
• Working for The Principle Contractor As The Commissioning Manager
• Heading a team of Commissioning Engineers responsible for Commissioning Completion
• Responsible for SSOW, LOTO, HV/LV Switching, Commissioning Procedures, Project Completion, Life Time Records, Client Training.
• Daily meetings between the client (Lynemouth Power Station) the clients representative (Ramboll Consultancy) and the landowners (Port of Tyne) to deliver first class deliverable project
• Treating each employee as an individual and showing concern for their welfare, aims and career development
• Always discrete in handling sensitive and confidential information
• Willing to delegate and allow members of staff the freedom to get on with specific tasks
• Open to constructive feedback and always listening carefully to what team members and clients have to say
• Authorised by Spencer as 11KV SAP
Being the commissioning manager, I am tasked with producing daily commissioning updates, planning commissioning works, planning contractor works, reviewing commissioning procedures, risk assessments and method statements, being fully aware of the quality assured documentation needed for the life time records, authorising the LUN (livening up notice) for the energisation of systems and equipment for commissioning and being put in to operation.
This renewable fuel terminal project involves the design and build of import facilities, wood pellet storage and rail loading facilities for biomass to meet the full requirements of Lynemouth Power Station.
Commissioning Manager (contract) March 2017 - October 2017
• Working for The Principle Contractor As The Commissioning Manager
• Heading a team of Commissioning Engineers responsible for Commissioning Completion
• Responsible for SSOW, LOTO, HV/LV Switching, Commissioning Procedures, Project Completion, Life Time Records, Client Training.
• Daily meetings between the client (Lynemouth Power Station) the clients representative (Ramboll Consultancy) and the landowners (Port of Tyne) to deliver first class deliverable project
• Treating each employee as an individual and showing concern for their welfare, aims and career development
• Always discrete in handling sensitive and confidential information
• Willing to delegate and allow members of staff the freedom to get on with specific tasks
• Open to constructive feedback and always listening carefully to what team members and clients have to say
• Authorised by Spencer as 11KV SAP
Being the commissioning manager, I am tasked with producing daily commissioning updates, planning commissioning works, planning contractor works, reviewing commissioning procedures, risk assessments and method statements, being fully aware of the quality assured documentation needed for the life time records, authorising the LUN (livening up notice) for the energisation of systems and equipment for commissioning and being put in to operation.
Design, Training, SAP, Development, Storage, Power, Manager, UP
2016 - 2017
temp
Commissioning Engineer Siemens Rail Electrification.
Siemens is a global powerhouse focusing on the areas of electrification, automation and digitalisation One of the world's largest producers of energy-efficient, resource-saving technologies.
Commissioning Engineer (contract) April 2016 - March 2017
• Commissioning Engineer on East Coast Mainline Power Supply Upgrade
• Commissioning Eighteen Substations/SMOS (Structure Mounted Outdoor Switchgear) Sites
• 25KV - ASG25 AIS Switchgear Test and Commissioned
• 25KV - 66KV AIS & GIS Switchgear Test and Commissioned
• 61850 ADP Testing, Pressure Testing, Primary & Secondary Testing, SCADA and IO Testing
• Omicron CMC & CT Analyzer Course
I was asked to become a Front Line Safety Coach for Siemens to help grow the business.
The role highlights the pressures and dangers we can put ourself under due to work/life commitments and how to manage this, resulting in improved well being and productivity at work
Commissioning Engineer (contract) April 2016 - March 2017
• Commissioning Engineer on East Coast Mainline Power Supply Upgrade
• Commissioning Eighteen Substations/SMOS (Structure Mounted Outdoor Switchgear) Sites
• 25KV - ASG25 AIS Switchgear Test and Commissioned
• 25KV - 66KV AIS & GIS Switchgear Test and Commissioned
• 61850 ADP Testing, Pressure Testing, Primary & Secondary Testing, SCADA and IO Testing
• Omicron CMC & CT Analyzer Course
I was asked to become a Front Line Safety Coach for Siemens to help grow the business.
The role highlights the pressures and dangers we can put ourself under due to work/life commitments and how to manage this, resulting in improved well being and productivity at work
Automation, Test, Gis, SCADA, Testing, Coach, Safety, Power, Energy, Energy
2014 - 2016
job
Commissioning Engineer/Lead Engineer/11KV Authorised Person Alstom Transport.
Alstom is a global leader in the world of power generation, power transmission and rail infrastructure, employing over 96,000 employees. Currently constructing the Tram line system in Nottingham.
Commissioning Engineer/Lead Engineer/11KV Authorised Person (contract) March 2014 - February 2016.
• Commissioning Engineer/ Authorised Person on the NET Nottingham Tram Extension Project
• Commissioning Nine Substations,11KV High Voltage Equipment, Power Transformers,
• Switchgear and Associated Protection, Rectification and Associated Protection,
• 11KV/750DC Switching, OHL/OLE Commissioning, Control systems, SCADA and IO Testing,
• Carry out plant commissioning from pre-commissioning through to functional,full load and hand over to client
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, and com-missioning and technical procedures.
Commissioning Engineer/Lead Engineer/11KV Authorised Person (contract) March 2014 - February 2016.
• Commissioning Engineer/ Authorised Person on the NET Nottingham Tram Extension Project
• Commissioning Nine Substations,11KV High Voltage Equipment, Power Transformers,
• Switchgear and Associated Protection, Rectification and Associated Protection,
• 11KV/750DC Switching, OHL/OLE Commissioning, Control systems, SCADA and IO Testing,
• Carry out plant commissioning from pre-commissioning through to functional,full load and hand over to client
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, and com-missioning and technical procedures.
Net, Infrastructure, SCADA, Testing, Safety, Power
2013 - 2014
temp
Commissioning Engineer Rhead Group.
Rhead Group is an international professional services consultancy providing a range of solutions for the lifecycle of infrastructure, construction and asset management programmes. Worked on New 32MW Gas Compressors.
Commissioning Engineer (contract) July 2013 - March 2014.
• Commissioning Engineer on a National Grid Gas Compressor site, Commissioning 5.32/11/132kV High Voltage equipment, 32 MW VSD's, Power Transformers, Switchgear and associated protection, control systems, carry out plant commissioning from pre-commissioning through to functional, full load runs and hand over to client representatives
• An Authorised Person on this site I have been commissioning, switching and isolating up to 11Kv equipment and assisting the SAP with 132Kv commissioning and testing
• The site consists of two 35 MW 132kV lines feeding into a 132kV SSE/NG switch yard which is in joint controlled under an interface agreement. The 132kV feeds two 32.2MVA Transformers that convert to 11kV and 5.32kV, the two 24MW motors are controlled by Siemens VSD convertors
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. I am also Scottish and Southern Energy (DNO) Authorised (C3a) to 132kV area access and Rhead Group Authorised to 11kV for isolation, lock out tag, switching control and issuing safety documents, risk assessments, method statement, prepare test and commissioning and technical procedure
JACOBS Engineering Group
Markinch Biomass Power Station 65MW
Jacobs Engineering Group Inc., is an international engineering, architecture, and construction firm with offices located around the world. Worked on New Biomass Project
Commissioning Engineer (contract) July 2013 - March 2014.
• Commissioning Engineer on a National Grid Gas Compressor site, Commissioning 5.32/11/132kV High Voltage equipment, 32 MW VSD's, Power Transformers, Switchgear and associated protection, control systems, carry out plant commissioning from pre-commissioning through to functional, full load runs and hand over to client representatives
• An Authorised Person on this site I have been commissioning, switching and isolating up to 11Kv equipment and assisting the SAP with 132Kv commissioning and testing
• The site consists of two 35 MW 132kV lines feeding into a 132kV SSE/NG switch yard which is in joint controlled under an interface agreement. The 132kV feeds two 32.2MVA Transformers that convert to 11kV and 5.32kV, the two 24MW motors are controlled by Siemens VSD convertors
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. I am also Scottish and Southern Energy (DNO) Authorised (C3a) to 132kV area access and Rhead Group Authorised to 11kV for isolation, lock out tag, switching control and issuing safety documents, risk assessments, method statement, prepare test and commissioning and technical procedure
JACOBS Engineering Group
Markinch Biomass Power Station 65MW
Jacobs Engineering Group Inc., is an international engineering, architecture, and construction firm with offices located around the world. Worked on New Biomass Project
SAP, Management, Test, Architecture, Engineering, Asset Management, Infrastructure, Testing, International, Safety, Power, Energy, Energy, UP
2012 - 2013
temp
Commissioning Technician Process Water/Filter Water Systems, Gas Compressor.
• Commissioning Technician on a 65MW Biomass CHP Plant at Markinch Fife
• Commissioning LV equipment, VSD's, Power Transformers, Switchgear, MCC, Fuel Handling Conveyors, Process Water/Filter Water Systems, Gas Compressor systems and associated protection systems, SCADA IO testing, carry out plant commissioning from pre-commissioning through to functional, full load runs and hand over to client representatives
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, preparing test and commissioning and technical procedures.
Amec Foster Wheeler
• Commissioning LV equipment, VSD's, Power Transformers, Switchgear, MCC, Fuel Handling Conveyors, Process Water/Filter Water Systems, Gas Compressor systems and associated protection systems, SCADA IO testing, carry out plant commissioning from pre-commissioning through to functional, full load runs and hand over to client representatives
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, preparing test and commissioning and technical procedures.
Amec Foster Wheeler
Test, SCADA, Testing, Safety, Power
2011 - 2012
temp
Commissioning Technician /QC/QA Amec Foster Wheeler plc.
is a British multinational consultancy, engineering and project management company headquartered in London, United Kingdom. Worked on New Underground Gas Storage Facilities.
Commissioning Technician /QC/QA (contract) March 2011 - Nov 2012
• Commissioning Technician on a Gas Storage Project in Cheshire
• Commissioning and carrying out QC/QA duties LV equipment, Power Transformers, Switchgear,
MCC, UPS systems, Motors, Batteries, Gas Compressor systems and associated protection systems,
Primary and carry out plant commissioning from pre-commissioning through to functional, hand over to client representatives
• My QC/QA Duties included the following all aspects of electrical inspection from hazardous to non-
hazardous equipment all documentation completed, certified, passed to insurers and construction,
commissioning and main client EDF, to complete inspection give unto date results to QC/QA Manager
and troubleshooting problems
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, and prepare test and commissioning and technical procedures.
Spie/WHS
SPIE is a leading E&I contracting company in Combined Cycle Gas Turbine (CCGT) projects having completed three major schemes with Alstom, we have the widest experience of new build plants in England and Wales providing complete project delivery. Worked on New CCGT Power Plant.
Commissioning Technician /QC/QA (contract) March 2011 - Nov 2012
• Commissioning Technician on a Gas Storage Project in Cheshire
• Commissioning and carrying out QC/QA duties LV equipment, Power Transformers, Switchgear,
MCC, UPS systems, Motors, Batteries, Gas Compressor systems and associated protection systems,
Primary and carry out plant commissioning from pre-commissioning through to functional, hand over to client representatives
• My QC/QA Duties included the following all aspects of electrical inspection from hazardous to non-
hazardous equipment all documentation completed, certified, passed to insurers and construction,
commissioning and main client EDF, to complete inspection give unto date results to QC/QA Manager
and troubleshooting problems
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, and prepare test and commissioning and technical procedures.
Spie/WHS
SPIE is a leading E&I contracting company in Combined Cycle Gas Turbine (CCGT) projects having completed three major schemes with Alstom, we have the widest experience of new build plants in England and Wales providing complete project delivery. Worked on New CCGT Power Plant.
Project Management, Management, Test, QA, Engineering, Storage, Safety, Power, QC, Manager
2010 - 2011
temp
Commissioning Technician West Burton CCGT Power Station.
• Commissioning duties LV equipment, Power Transformers, Inter-trip panels and tripping matrix Switchgear, MCC, UPS systems, Motors, Batteries systems, Loop test to control and supervision computerised systems, primary and secondary testing of instrument transformers (current and voltage transformers) and associated protection systems, carry out plant commissioning from pre-commissioning through to functional, hand over to client representatives.
• LV Switching
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, and com-missioning and technical procedures
Wood Group/ PSN
• Wood Group is a multinational oil and gas services company headquartered in Aberdeen,Scotland
.Worked On BP Sullom Voe Oil Refinery
• LV Switching
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules. Isolation, switching control, documents, prepare risk assessments, method statement, and com-missioning and technical procedures
Wood Group/ PSN
• Wood Group is a multinational oil and gas services company headquartered in Aberdeen,Scotland
.Worked On BP Sullom Voe Oil Refinery
Test, Testing, Supervision, Safety, Power, Oil and Gas
2009 - 2010
temp
Electrical Compex inspector on BP Compex Inspection.
Sullom Voe Oil Terminal
• Duties includes the following: Inspection and Test of Equipment in Hazardous Areas
• All Relevant Paper Work and Documentation Signed and Completed
• EX Cabling, glands, terminations on LV equipment, transformers, MCC, UPS systems, motors, batteries systems, lighting, pumps, fans and switchgear
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules documents, risk assessments, method statement, and commissioning and technical procedures.
Balfour Beatty
Balfour Beatty plc is a multinational infrastructure group with capabilities in construction services, support services and infrastructure investments. Worked On New Oil Platform For Nexus.
• Duties includes the following: Inspection and Test of Equipment in Hazardous Areas
• All Relevant Paper Work and Documentation Signed and Completed
• EX Cabling, glands, terminations on LV equipment, transformers, MCC, UPS systems, motors, batteries systems, lighting, pumps, fans and switchgear
I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules documents, risk assessments, method statement, and commissioning and technical procedures.
Balfour Beatty
Balfour Beatty plc is a multinational infrastructure group with capabilities in construction services, support services and infrastructure investments. Worked On New Oil Platform For Nexus.
Test, PLC, Support, Infrastructure, Safety
2005 - 2006
temp
Electrical Technician unknown.
• Electrical Technician on the Channel Tunnel Link Project
• As an Electrical TMB Technician on the above project I supported the Tunnel Boring Machine team with all electrical functions as follows: glanding and terminating cables up to 11Kv and cable jointing up to 3.3Kv, installing supplies to compressors, motors, winches, batching plants, conveyors, Tunnel sup-plies from 3.3Kv to 24v, 11Kv TBM supply, installing and maintaining pumps from 110v - 415v Working with PLC's on the conveyor system, fault finding as necessary, reading and understanding drawings.
Working within tunnel safety rules I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules documents, risk assessments, method statement, and commissioning and technical procedures.
Amec Foster Wheeler
Amec Foster Wheeler plc is a British multinational consultancy, engineering and project management company headquartered in London, United Kingdom. Worked On Largest FPSO in World
• As an Electrical TMB Technician on the above project I supported the Tunnel Boring Machine team with all electrical functions as follows: glanding and terminating cables up to 11Kv and cable jointing up to 3.3Kv, installing supplies to compressors, motors, winches, batching plants, conveyors, Tunnel sup-plies from 3.3Kv to 24v, 11Kv TBM supply, installing and maintaining pumps from 110v - 415v Working with PLC's on the conveyor system, fault finding as necessary, reading and understanding drawings.
Working within tunnel safety rules I am fully conversant with all Safety Documentation and Procedures, Permit to Work Systems and Electrical Safety Rules documents, risk assessments, method statement, and commissioning and technical procedures.
Amec Foster Wheeler
Amec Foster Wheeler plc is a British multinational consultancy, engineering and project management company headquartered in London, United Kingdom. Worked On Largest FPSO in World
Project Management, Management, Engineering, PLC, Safety, UP
2005 - 2005
temp
Electrical Technician unknown.
• Electrical Technician on the Shell Bonga Oil & Gas Production Vessel Project
• As an Electrical Technician on the above project I was involved in the installation of cable tray, cabling, glanding, terminating, panel wiring, MCC, switchgear and testing and commissioning of electrical EX systems and sub-sea equipment.
• As an Electrical Technician on the above project I was involved in the installation of cable tray, cabling, glanding, terminating, panel wiring, MCC, switchgear and testing and commissioning of electrical EX systems and sub-sea equipment.
Testing, Production
1993 - 1997
internship
Apprenticeship /Electrical Technician Work Systems and Electrical Safety Rules.
documents, risk assessments, method statement, and commissioning procedures.
Apprenticeship /Electrical Technician 1993-1997
Serving my apprentice with South Tyneside Council
I had a wide range of experience from domestic, commercial and industrial installations, working my way to a supervisor, looking after projects and sites, controlling all aspects of contracts from man management, quality and technical.
Apprenticeship /Electrical Technician 1993-1997
Serving my apprentice with South Tyneside Council
I had a wide range of experience from domestic, commercial and industrial installations, working my way to a supervisor, looking after projects and sites, controlling all aspects of contracts from man management, quality and technical.
Controlling, Contracts, Management, Contracts
Graeme's reviews
Graeme has not received any reviews on Worksome.
Contact Graeme Brown
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Graeme directly in Worksome.
are ready to help you
and get specific bids from skilled talent in Denmark